Home01 About02 Services03 Projects04 Field Notes05 FAQ06 Contact07
TR/EN
INFO@AFCEL.COM.TR
+90 532 649 33 26
High-bay automated warehouse steel construction
01

Engineering &
preparation.

Static review, shop-drawing checks, BOM extraction, transport and crane planning. We start the project on the desk so the site doesn't fail at the calendar.

  • Project static review & shop-drawing audit
  • Steel quantity / tonnage take-off (BOM)
  • Procurement plan & production schedule
  • Transport & crane plan, site survey
Industrial steel fabrication and warehouse erection
02

Fabrication &
logistics.

Cutting, welding, blasting, painting/galvanising and shipping. Standards-compliant fabrication and on-time delivery.

  • Cutting, welding & quality control
  • Surface preparation: blasting, primer, top-coat
  • Hot-dip galvanising arrangement
  • Logistics & site delivery scheduling
Helicopter hangar steel erection on site
03

On-site erection
& handover.

Crane choreography, geometry/alignment, bolting, snagging and hand-over. Zero-incident erection backed by a 9-year safety record.

  • Daily H&S toolbox + permit-to-work
  • Geometry & alignment surveys
  • High-strength bolting torque records
  • Snagging list & final handover
Workflow

From kick-off
to handover
in seven steps.

  1. 01

    Brief intake

    Tonnage, location, timeline, drawings.

  2. 02

    Feasibility

    Static review, BOM, crane & transport plan.

  3. 03

    Quote & contract

    Itemised quote, terms, milestones.

  4. 04

    Procurement

    Steel ordering, shop scheduling.

  5. 05

    Fabrication

    Cutting, welding, blasting, coating.

  6. 06

    Erection

    Crane lifts, bolting, alignment.

  7. 07

    Handover

    Snagging, certificates, sign-off.

Ready to start?

Let's talk
about your project.